portfolio_page-template-default,single,single-portfolio_page,postid-585,bridge-core-2.3.9,qode-page-transition-enabled,ajax_fade,page_not_loaded,,vertical_menu_enabled,qode_grid_1300,side_area_uncovered_from_content,qode-child-theme-ver-1.0.0,qode-theme-ver-27.9,qode-theme-bridge,disabled_footer_top,qode_header_in_grid,wpb-js-composer js-comp-ver-6.2.0,vc_responsive

Control of effectiveness of application of corrosion inhibitors in building in Barcelona

About This Project

Following the recommendations of the technical suitability document of the applied product, corrosion rate measurements were carried out after the application of the inhibitor, to check whether, indeed, passivation and increased resistivity of the treated reinforced concrete had been achieved. It is necessary to emphasize the importance of studying the state of corrosion before and after the application of the product.